
CONDENSING WALL HUNG BOILERCentral Heating - Fanned Flue systemInstallation and OperatingInstructionsCentora green system 24Centora green system 30cMa
106PVPFig. 12Making the Electrical ConnectionsHinge down the electrical box to gain access to the electrical connections. Push in the tabs P (Fig 12)
117TT12Fig. 16Fitting the casingRemove the protecting film from the casing :- Position the casing as shown in Fig. 16- Slide down the casing and put t
12The boiler is delivered with a pre setting values described in menus 3 and 4.All settings can be changed by the installer or a qualified person. To
135 ”Menu - 1 - Default registerRecord the last 10 defaultsSection Digit 1 Digit 2 and 3Last default occured 0•code from 01 to 99Last but one default
14Menu - 3 - Boiler optionsDISPLAYACTIONCONFIGURATIONSection Digit 1 Digit 2 and 3Under floor heating system 0 0 : no1 : yesFactorysettingoncex timesM
15Menu - 5 - Combustion rate control modeX XX XDISPLAYACTION CONFIGURATIONwait 5 ”Combustion rate control mode OFFSwitching on the combustion ratecont
16CH heat output setting :If you would like to change the setting of C/H heat output, please proceed as follow :(NOTE: the factory setting is 18 kW an
1710In case of problem, or when the boiler has to display a message, the display flashes 2 digits. Please refer to the table bellowto diagnose the d
18USER’S INSTRUCTIONSControl panel (Fig. 19)16.- Pressure gauge24.- Display temperature adjustment27.- Setting key28.- Setting key29.- Switch for Ce
19Switching on1. Check that pressure in central heating system is above 0.7 bar and below 1.5 bar with the pressure gauge 16.2. Check that the gas ser
2These instructions are suitable for the CENTORA GREEN System boilers :Do not forget the Log Book!Chaffoteaux & Maury supports Benchmark, the heat
20As with your car, your boiler will work more reliably and efficiently if regularly serviced. We recommend an annual servicecheck. The service histor
21This appliance is suitable for Natural gas or LPG. A gas conversion must be made by a competent person.1718If these solutions do not cure the faul
2219Model Centora Green System 24 Centora Green System 30Appliance category... II 2H3P II 2H3PHeat gross input
1310360g- 3/2004Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications withoutprio
3CUSTOMER CAREPageGuarantee ...
45 INSTALLING THE BOILER ...
51.- Steel chassis complete with expansion vessel 2.- Sealed chamber3.- Burner and heat exchanger assembly4.- Air / gas connection5.- 24 V modulatin
6043215610020080070060050040030090010001100 l/hmCEDébit mini (robinets thermostatiques fermés)Hauteur manométriqueGVFGVOPVFPVO20 40 60 80 100 120Pf140
74LocationThe boiler can be installed on any suitable internal wall.Provision must be made to allow the correct routing of the flueand siting of the t
85Please check that you are familiar with the installation requirements before commencing work.(section 6)The installation accessories described in th
95AFig.10AAAFig. 9Fig. 8Fig.11Installing the Boiler (continued)This means for rear flueing, the standard kit will accommodate a maximum wall thickness
Commenti su questo manuale